Ongoing
연구프로젝트명 | 수행기간 | 연구비 지원기관 |
수행기간 총 연구비 (원) |
연간(평균) 연구비 (원) |
---|---|---|---|---|
Large capacity and high reliability SOFC module and system development for power generation | 2018.06.01 - 2021.12.31 | Korea Institute of Energy Technology Evaluation and Planning | 424,940,000 | 118,587,907 |
Minimization of exhaust heat loss and catalyst flow improvement during catalytic heating zone for gasoline turbo engine SULEV | 2018.06.01 - 2019.11.30 | Hyundai Motor Company | 136,510,000 | 91,006,667 |
Development of core-technology for sustainable energy conversion systems facilitating oxy-fuel conversion and CO2 utilization | 2018.06.01 - 2019.05.31 | National Research Foundation of Korea | 50,000,000 | 50,000,000 |
Development of on-liquid sampling technology of airborne pathogen using electrical characteristics of aerosols | 2018.03.01 - 2022.08.31 | National Research Foundation of Korea | 920,000,000 | 230,000,000 |
Fabrication of ultra porous anti-viral activated carbon fiber by using electrospinning process/heat treatment process and performance test via aerosol technique | 2018.03.01 - 2021.02.28. | National Research Foundation of Korea | 847,169,000 | 282,389,667 |
Prediction of space sterilization efficiency for virus and analysis of human infection rate | 2018.01.02 - 2018.12.31 | LG Electronics, Inc. | 66,000,000 | 66,000,000 |
Long-term stable protonic ceramic fuel cells with large-scale nano-multi-layer structures implementing over 1W/cm2 at 300~500C | 2017.12.01 - 2020.11.30 | Korea Institute of Energy Technology Evaluation and Planning | 305,880,000 | 101,960,000 |
Development of IoT based construction dust monitoring and reduction solutions | 2017.11.01 - 2020.10.31 | Seoul Business agency | 402,270,000 | 134,090,000 |
Development of cooking-originated particulate matter removal technology | 2017.09.08 - 2020.05.31 | National Research Foundation of Korea | 762,000,000 | 254,000,000 |
Smart design of SOFC repeating units for thermal-electrical load following by integrative multiphysics analysis | 2017.08.01 - 2021.12.31 | National Research Foundation of Korea | 315,000,000 | 71,320,755 |
Development of highly durable and reliable SOFC stack modules under severe cycling operating conditions | 2017.06.01 - 2019.05.31 | Korea Institute of Energy Technology Evaluation and Planning | 80,000,000 | 40,000,000 |
A study on impaction of particles leaked by steam generator tube rupture | 2017.03.01 - 2019.12.31 | National Research Foundation of Korea | 150,000,000 | 50,000,000 |
Development of integrated control system for analysis of micro dust / precursor behavior and diffusion pattern of thermal power plant | 2016.12.01 - 2019.11.30 | Korea Institute of Industrial Technology | 712,000,000 | 237,333,333 |
Study of aluminum flocculation model during solid propellant combustion | 2016.12.01 - 2018.12.15 | Agency for Defense Development | 242,400,000 | 121,200,000 |
Development of AQCS solution for PM10 emission control for Korean Standard and New Standard Coal-fired Power Plants | 2016.12.01 - 2018.11.30 | Korea Energy technology evaluation and planning | 523,353,000 | 261,676,500 |
Design of large scale metal oxide nanoparticle generator via spark discharge and electrostatic filter coating facility and evaluation of deodorization performance of air filter | 2016.05.18 - 2018.12.31 | Korea Environmental Industry and technology institute | 424,000,000 | 141,333,333 |
Multifunctional energy material design and combination technology | 2015.03.20 - 2020.12.31 | Agency for Defense Development | 940,000,000 | 104,444,444 |
Development of electrical charging and agglomeration system for removal of Fine/ultra-fine particles in subway tunnel | 2014.09.03 - 2019.02.28 | Korea Agency for infrastructure Technology | 190,000,000 | 38,000,000 |
Development of LNG supply system for natural gas-diesel mixed dispersion power generation system | 2013.08.01 - 2018.11.30 | Korea Institute of Energy Technology Evaluation and Planning | 240,000,000 | 48,000,000 |
Completed
연구프로젝트명 | 수행기간 | 연구비 지원기관 |
수행기간 총 연구비 (원) |
연간(평균) 연구비 (원) |
---|---|---|---|---|
Flow simulation for local M / E (Mini Environment) optimization | 2018.04.02 - 2018.05.04 | LG Electronics, Inc. | 16,500,000 | 16,500,000 |
Improvement of measurement performance of Dust Sensor for vehicle | 2017.02.01 - 2017.12.15 | Hitachi-LG data storage korea, Inc. | 55,000,000 | 55,000,000 |
Development of simultaneous removal technology for NOx and SOx | 2016.09.01 - 2017.08.31 | LG Electronics, Inc. | 60,000,000 | 60,000,000 |
3D Numerical Analysis of Fluidized Bed Boiler Element and related system | 2016.06.01 - 2018.05.31 | Korea electric power corporation | 200,970,000 | 100,485,000 |
Air-based manufacturing of deodorization filter via spark discharge generation of metal oxide catalytic nanoaerosols and electrostatic coating on filter medium | 2016.05.18 - 2018.12.31 | Korea Environmental Industry & Technology Institute | 424,000,000 | 141,333,333 |
Analysis of improvement of exhaust characteristics through the flow and heat transfer analysis of the exhaust system of the Seta Turbo engine | 2016.05.01 - 2017.12.31 | Hyundai Motor Company Inc. | 140,250,000 | 93,500,000 |
Development and Optimization of Closed Loop Control Logic for MAF and EGR Balance | 2016.02.01 - 2018.03.31 | Hyundai Motor Company Inc. | 163,625,000 | 81,812,500 |
Smart phone heat dissipation technology research | 2016.02.01 - 2017.03.31 | LG Electronics Inc. | 55,000,000 | 55,000,000 |
Development of real-time monitoring of indoor/outdoor particulate matter | 2015.12.01 - 2017.09.30 | Korea Environmental Industry & Technology Institute | 460,000,000 | 230,000,000 |
Airbone virus detection and analysis technology | 2015.09.24 - 2016.08.31 | Korea Railroad Research Institute | 20,000,000 | 20,000,000 |
A Study on the Improvement of Fuel Economy and NOx through Dual-loop EGR Distribution Optimization and Prediction of LP EGR Usage Limit | 2015.09.18 - 2017.03.31 | Hyundai Motor Company Inc. | 93,500,000 | 62,333,333 |
CFD model test for Yeosu Thermal Power Plant Desulfurization Facility | 2015.08.20 - 2015.10.19 | HALLA energy & Environmental Co.,Ltd. | 11,000,000 | 11,000,000 |
CFD study for Flow uniformization of Electrostatic Precipitator(PAGBILAO) | 2015.08.20 - 2015.10.19 | KC-cottrell, Inc. | 5,500,000 | 5,500,000 |
Real-time electric particle concentration measurement technology development | 2015.08.01 - 2016.05.31 | HTC, Inc. | 60,000,000 | 60,000,000 |
Process improvement of waste CHP plant for export | 2015.06.01 - 2018.05.31 | Korea Institute of Energy Technology Evaluation and Planning | 165,000,000 | 55,000,000 |
Study on site-selective aerosol deposition and application to produce functional activated carbon fiber | 2015.05.01 - 2018.04.30 | National Research Foundation of Korea | 897,000,000 | 299,000,000 |
Development of Ultrasonic Apparatus for Reducing Indoor Contaminants such as Bacteria, Virus and Fine Particles | 2015.04.01 - 2018.03.31 | Korea Environmental Industry & Technology Institute | 126,060,000 | 42,020,000 |
Study on recycling of waste propellant | 2015.03.20 - 2017.12.15 | Agency for Defense Development | 284,400,000 | 94,800,000 |
An enhancement study of aerosol behavior models for severe accident source term assessment | 2015.03.01 - 2017.02.28 | National Research Foundation of Korea | 100,000,000 | 50,000,000 |
Development of measurement technology for nanoparticles (0.01~1㎛) | 2015.01.01 - 2018.04.30 | Korea Environmental Industry & Technology Institute | 227,000,000 | 75,666,667 |
A Study on the Design of a Compact Fixed-Phase Reformer Using Oxygen Transmitting Materials | 2014.12.01 - 2017.10.31 | National Research Foundation of Korea | 296,732,000 | 98,910,667 |
CFD model test for Yeosu Thermal Power Plant Desulfurization Facility | 2014.08.25 - 2015.12.31 | HALLA energy & Environmental Co.,Ltd. | 18,700,000 | 18,700,000 |
Development of energy saving air conditioner filter system for super fine dust reduction | 2014.08.01 - 2015.07.31 | Ministry of SMEs and Startups | 87,923,000 | 87,923,000 |
Computational fluid dynamic study for minimizing boiler combustion failure | 2014.07.25 - 2014.10.27 | Korea electric power corporation | 29,757,730 | 29,757,730 |
Optimization of fluidized bed boiler combustion using computational fluid dynamic study | 2014.06.25 - 2016.03.04 | Korea South-East Power CO.Ltd | 165,000,000 | 55,000,000 |
A study on bio-heavy oil commercialization technology | 2014.06.25 - 2015.06.17 | Korea District Heating Corporation | 25,333,000 | 25,333,000 |
Development of high density electro charging depth filter media and multi-electro charging harmful nano-aerosol | 2014.05.01 - 2016.03.31 | Korea Environmental Industry & Technology Institute | 50,000,000 | 25,000,000 |
Development of continuous fabrication system for an anti-bacterial/viral air filter based on dry aerosol coating process in standard pressure | 2014.05.01 - 2016.03.31 | Korea Environmental Industry & Technology Institute | 276,100,000 | 138,050,000 |
A study of aerosol behavior models for severe accident source term assessment | 2014.03.01 - 2015.02.28 | National Research Foundation of Korea | 40,000,000 | 40,000,000 |
Development of separation/sampling technology of airbone pathogen using aerodynamic and electrical characteristics of aerosols and preprocessing technology based on micro/nano-fluidic channel | 2014.01.01 - 2018.02.28 | National Research Foundation of Korea | 1,713,200,000 | 428,300,000 |
Study on Improvement of Combustion Characteristics and Thermal Efficiency of Gasoline Engine in Hydrogen Combustion Room | 2013.11.01 - 2018.07.31 | Hyundai Motor Company Inc. | 285,600,000 | 63,466,667 |
The source technology development of diesel-hybrid system for 1-liter car | 2013.11.01 - 2017.10.31 | Korea Evaluation Institute of Industrial Technology | 430,200,000 | 107,550,000 |
Development of ozone removal system | 2013.08.01 - 2016.03.31 | LG Electronics, Inc. | 30,000,000 | 30,000,000 |
CFD study for flow uniformization of Electrostatic Precipitator(Samcheok Thermal Power Plant) | 2013.07.01 - 2014.12.31 | KC-cottrell, Inc. | 37,000,000 | 37,000,000 |
A Study on the Blockage of Heat Exchanger in simulated desert environment | 2013.07.01 - 2014.09.30 | LG Electronics, Inc. | 10,000,000 | 10,000,000 |
Development of real-time sensing module for suspended microorganisms | 2013.06.03 - 2013.07.31 | LG Electronics, Inc. | 3,000,000 | 3,000,000 |
Performance evaluation of atmospheric discharge module | 2013.05.23 - 2013.06.22 | LG Electronics, Inc. | 5,000,000 | 5,000,000 |
A Study on the Prediction of NOx in CNG Engine by OD Analysis | 2013.05.01 - 2014.12.31 | Doosan Infracore Inc. | 39,000,000 | 39,000,000 |
Development of oil-mist collection and removal module | 2013.04.01 - 2016.12.31 | LG Electronics, Inc. | 50,000,000 | 50,000,000 |
Establishment of Cylinder Deviation Evaluation Technique in CNG Engine and research for improvement | 2013.04.01 - 2014.12.31 | Doosan Infracore Inc. | 40,000,000 | 40,000,000 |
Performance evaluation of atmospheric discharge module | 2013.02.12 - 2014.12.31 | LG Electronics, Inc. | 4,500,000 | 2,250,000 |
Evaluation of collection and oxidation characteristics of METAL FIBER MEDIA | 2013.02.01 - 2014.06.30 | Fibertech Co. | 19,800,000 | 19,800,000 |
A Study on IR and Optical Signal Measurement of Rocket Plume | 2013.01.10 - 2014.10.31 | Hanwha Inc. | 100,000,000 | 50,000,000 |
Development of air purification filter system using inorganic silver nanocomposite materials for virus trapping/removal | 2012.09.01 - 2015.08.31 | National Research Foundation of Korea | 416,000,000 | 138,666,667 |
Nanoaerosol Material Technology | 2012.09.01 - 2013.08.31 | National Research Foundation of Korea | 340,000,000 | 340,000,000 |
Research on optimization of Zn powder manufacturing process | 2012.05.01 - 2013.04.30 | Hanchang Inc. | 24,000,000 | 24,000,000 |
CFD study on Nitrogen oxide reduction facility for steel mill | 2012.04.24 - 2013.07.31 | HALLA energy & Environmental Co.,Ltd. | 8,000,000 | 8,000,000 |
Center for Specialized Research on Defense Detection Reduction Technology | 2012.03.09 - 2015.08.31 | Agency of Defense Development | 473,937,000 | 135,410,571 |
Study on Chemical Ignition Delay Characteristics of Diesel Engine under Different Operating Conditions | 2012.01.01 - 2014.12.31 | Doosan Infracore Inc. | 100,000,000 | 33,333,333 |
Development of pre-mixed compression ignition biogas engine for power generation of 40 KW capable of satisfying power generation efficiency of 5% or more and nitrogen oxide emissions of less than 30 PPM | 2011.11.01 - 2014.02.28 | Blue Planet Co. | 300,000,000 | 150,000,000 |
Development of integrated control and operation technology through construction of cogeneration power plant | 2011.09.01 - 2014.08.31 | Korea East-West Power Co.Ltd | 100,000,000 | 33,333,333 |
Development of a system for simultaneously removing indoor particulate matters and bioaerosol using air ions | 2011.05.01 - 2014.03.31 | Korea Environmental Industry & Technology Institute | 360,000,000 | 120,000,000 |
Optimization of fluidynamic and chemical reaction for high H2/CO ratio syngas production via coal-biomass co-gasification | 2010.12.01 - 2013.11.30 | Korea Institute of Energy Technology Evaluation and Planning | 600,000,000 | 200,000,000 |
Numerical Study on Improvement and Optimization of EGR Distribution of Large Diesel Engines | 2010.10.15 - 2012.10.14 | Doosan Infracore Inc. | 80,000,000 | 40,000,000 |
Study on feasibility of biogas catalytic reforming using waste heat from engine exhaust gas | 2010.06.01 - 2011.05.31 | Ministry of Knowledge Economy | 230,000,000 | 230,000,000 |
Optimization and application of CO2 reforming using the combustion of plasmas and catalysts | 2010.05.01 - 2013.04.30 | National Research Foundation of Korea | 297,000,000 | 99,000,000 |
Study on Optimization of Waste Gas Mixture Generation by Small Gasifier and Gas Generator Engine | 2008.12.01 - 2011.09.30 | Ministry of Knowledge Economy | 326,000,000 | 108,666,667 |
Plasma Gas Studies | 2008.10.01 - 2009.07.01 | AMARANTE | 84,674,693 | 84,674,693 |
Development of NOX/NH3 dual sensor | 2008.04.01 - 2009.04.30 | LG Micron Inc. | 93,113,000 | 93,113,000 |
Studies on Catalytic removal of toxic gases | 2007.08.01 - 2008.07.31 | AMARANTE | 27,271,500 | 27,271,500 |
Development of Fuel Cell Measurement Process Gas Composition Measurement Technology Using Laser Spectroscopy Technology | 2007.06.20 - 2008.03.31 | Samsung Electronics Inc. | 30,000,000 | 40,000,000 |
CHARACTERIZATION OF A PLASMA FORMING DEVICE FOR THE FUEL REFORMING PROCESS | 2006.07.01 - 2008.06.30 | National Research Foundation of Korea | 50,600,000 | 25,300,000 |
Real-time measurement and removal technology of particulate matter for simultaneous reduction of PM / NOX | 2005.07.01 - 2009.07.31 | Ministry of Trade, Industry and Energy | 180,210,000 | 45,052,500 |